The 2nd ZERO-PLUS progress meeting took place in Thessaloniki, Greece on 12th -13th September 2016. The meeting was hosted by the project partner FIBRAN (Greece). The focus of the meeting was on the outcomes of the design and optimization of the energy and environmental performance of the 4 case studies at building and settlement level as well as on the final integrated designs of the ZERO-PLUS settlements. Twenty five members of the consortium participated in the meeting where they got to present their achievements so far and discuss the planning for the coming months. A lot of work has been carried out since the last meeting and the project’s progress and accomplishments have been found to be very satisfactory.

In addition, one external invited expert participated in the meeting and provided valuable comments and suggestions to the consortium on the progress and quality of work performed in the project.

A visit to the FIBRAN factory was also organised where the manufacturing processes and insulation products manufactured by FIBRAN were demonstrated. Special emphasis was given to the insulation materials (extruded polystyrene - xps) that will be used in the 4 case studies. 


Gallery

  • 1
  • 2
  • 3
  • 4

Login

Newsletters