ZERO-PLUS LIVE VIEW


Voreppe, France

This ZERO-PLUS video shows the construction process on site in the France case study from

22.06.2018 until 04.09.2018.

 


This ZERO-PLUS video shows the installation of the MRE technology on site in the France

case study from 04.09.2018 until 12.10.2018.

 


Current state of the France case study building on the 02.07.2019.

 

Gallery

  • 1
  • 2
  • 3
  • 4

Login

Newsletters


I agree to the processing of my given personal data for the shipment of the ZERO-PLUS newsletter through TUM.

At any given time, without affecting the legitimacy of the processing of my data on the basis of prior approval, I may withdraw my consent until my submission of consent on the basis of Article 6(1) General Data Protection Regulation. Upon receiving my notice of withdrawal of consent, the controller will directly delete all of my personal data from the shipment of the newsletter.

Our processor in the context of the mailing is: rapidmail (www.rapidmail.de).

By law, participants have a right to information, rectification, erasure, restriction of processing, or objection to processing or data portability. Furthermore, participants have a right of complaint and the right to appeal to the Bavarian commissioner for data protection.

Further questions or a withdrawal should be addressed to us (info(at)br2.ar.tum.de) or the data protection (www.datenschutz.tum.de).